Hey everyone, happy holidays. First time posting. I'm assisting on a home renovation project where a temporary power pole will be installed. I've been tasked with submitting an application for the permit. The counter visit told me about the prerequisites I'd need to include. One being the MSR # from SCE. Could someone with insight into the process lend me a hand? Thanks a lot!
- Location
- Santa Barbara, California, United States